Vesgantti 97" Modular Sectional Sofa Light Gray, Sectional Couch with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Modular Sofa with Deep Seat for Living Room, Bedroom and Apartment

Vesgantti 97" Modular Sectional Sofa Light Gray, Sectional Couch with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Modular Sofa with Deep Seat for Living Room, Bedroom and Apartment

$992.94
Skip to product information
Vesgantti 97" Modular Sectional Sofa Light Gray, Sectional Couch with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Modular Sofa with Deep Seat for Living Room, Bedroom and Apartment

Vesgantti 97" Modular Sectional Sofa Light Gray, Sectional Couch with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Modular Sofa with Deep Seat for Living Room, Bedroom and Apartment

$992.94
Shipping calculated at checkout.

About This

  • FSC Certified Solid Wood - Constructed from materials sourced from responsibly managed forests, upholding sustainable forestry practices. This modular sofa is prized for its robust durability, boasting a maximum weight capacity of 800 pounds. What’s more, the sofa is equipped with non-slip protective pads on the base of its legs, ensuring stability while safeguarding flooring from damage
  • Ergonomic Design & Superior Comfort – The spring-loaded cushions of this L-shaped sofa absorb daily wear and tear, resisting premature deterioration to extend the sofa’s lifespan. A standout feature is its 21-inch seat depth, which offers ample support whether you’re sitting upright or reclining. Complementing this, the 26.4-inch ottoman enhances relaxation by providing leg support or extra seating—together, they deliver exceptional lumbar support and pressure relief, ensuring every moment of relaxation feels both effortless and indulgent
  • Modular Sectional Sofa - Boasts 2 removable ottomans, allowing you to arrange it as a snug L-shaped sectional or use the ottoman on its own as a footrest, three-seater sofa, or extra seating. Rearrange it freely to fit your space—ideal for living rooms, apartments, or bedrooms. Its functional versatility and sleek design seamlessly elevate any atmosphere, making it easy to create a customized setup
  • Durable Corduroy Upholstery – This corduroy sofa boasts a distinctive pattern and texture, defined by parallel ridges that lend it a smooth, soft feel. The contemporary couch features a velvety, rounded surface with a crisp appearance, enhancing its luxurious look. What’s more, the sectional is thickly padded and highly wear-resistant, making it an exceptional choice for anyone seeking both comfort and long-lasting durability
  • Ships in 4 Separate Packages – please note they may arrive at different times. Minor variations in color or size may occur due to screen displays or manual measurements. Assembly is easy and takes just 30 minutes, with no extra tools required. Due to compressed packaging, cushions will take 24–48 hours to fully expand; gently patting them can help speed up fluffing for optimal comfort. Feel free to reach out with any questions

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Seat Depth : 21 inches
  • Seat Height : 5.5 Inches
  • Weight Limit : 800 Pounds
  • Seating Capacity : 6.0
  • Product Dimensions : 57.9"D x 96.8"W x 35"H
  • Item Weight : 80.24 Pounds
  • Leg Length : 7.5 Inches
  • Type : Sectional
CARE & MAINTENANCE

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

SHIPPING & RETURNS

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.

You may also like