







6 in 1 Convertible Folding Sleeper
US$1,079.98
Arrives as soon as ✓ Free shipping — over $150Description
6-in-1 Convertible Folding Sofa Bed: Featuring a simple folding mechanism, the convertible sofa easily transforms into at least 6 modes: loveseat, L shaped sofa, foldable couch, lounger, queen &...
Delivery & Returns
Take two, save 10%
Add any 2 pieces from the collections and 10% comes off at checkout. No code needed.
Reviews
You might also like
JANHOLOHANG
Wall Folding Coffee Table
US$107.98
Heakrit
x21.7'' Metal Side Table
US$95.38
IFSEB
Makeup Vanity Glass Top
US$277.56
5-Star
5pc XL Oversized Tray Table Set
US$168.31
GAORUIFENG
Steel Bottle Wine Holder
US$53.66
Tribesigns
Behind 63-Inch Wooden Console Table
US$260.98
Nnewvante
Bamboo Couch Trays
US$68.38
SWEVEN
36-Inch Bamboo Benches
US$134.91
YATINEY
Height Console Table
US$89.98
MIINA
55x78-Inch Full Traditional Tatami Mat
US$340.20
VASAGLE
Chestnut Walnut TV Stand
US$251.98
IZLKQC
75'' Folding Sleeper Sofa Bed
US$397.06
More options
- 6-in-1 Convertible Folding Sofa Bed: Featuring a simple folding mechanism, the convertible sofa easily transforms into at least 6 modes: loveseat, L shaped sofa, foldable couch, lounger, queen & king guest bed. It combines style, comfort, and space-saving functionality in one smart design. The adaptive design allows you to reconfigure the sofa into various shapes that meets the needs of different occasions, such as naps, movie nights, friends' gathering or overnight guests etc.
- Ergonomic Comfort Design: This convertible couch with chaise features a fully foam-filled structure, 3 adjustable reclining angled backrest pillows, and curved armrests that follow your body's natural posture and deliver superior pressure relief and ergonomic support. Filled with resilient high-density foam that maintains shape and provides balanced support for sitting or sleeping. This sofa bed is an ideal choice for modern lifestyles.
- Sturdy & Durable: No separate metal or wooden frame needed — the foam core acts as both cushion and structural support, eliminating weak joints, loose screws, or wobbling legs. Non-slip bottom keep the couch bed securely in place on hardwood or tile floors, while preventing scratches and reducing noise during adjustment. This frameless, integrated design makes the sofa bed couch lightweight yet incredibly stable and is perfect for years of daily folding and unfolding
- Premium Chenille Fabric: The foldable couch is crafted from soft, skin-friendly chenille fabric, which is scratch-resistant, wrinkle-resistant and pill-resistant; ensuring long-term durability and making it perfect for daily use. The tightly woven surface is pet-friendly — fur, dirt, and scratches are easily cleaned with a lint roller or damp cloth, keeping your sofa looking fresh (Note: Colors may vary slightly due to lighting or monitor settings)
- No Assembly Required:: No tools or complicated setup are required. Our boneless couch bed is compressed and vacuum-packed; just simply unfold, adjust to your preferred configuration, and wait 72 hours for full recovery. The foldable sofa bed is packaged in 2 boxes, which may arrive on different days. Before assembling, please check all packages.
Specifications
- Brand: Vesgantti
- Color: Beige
- Size: 110.2" Right Facing Chaise
- Dimensions: 37.4 x 110.2 x 24.4 inches
- Item Weight: 82 pounds
- Included Components: Throw Pillow
- Shape: L-Shape
- Seat Depth: 27.6 inches
- Seat Height: 17.71 inches
- Sofa Type: Sofa Bed
- Additional Features: Vacuums
- Room Type: Living Room
- Indoor Outdoor Usage: Indoor
- Orientation: Right Hand Facing
Shipping Policy
Everwood Interiors ships from the United States.
Most orders leave the warehouse within 1 business day and arrive in 2–7 business days.
- Free shipping on orders over $150 — applied automatically
- Orders under $150 ship for a flat $4.90
- Your tracking number is emailed as soon as your order ships
- We currently ship to the lower 48 United States
Return policy
30 days, on us.
If it's not right for the room, you have 30 days from delivery to send it back — Everwood Interiors emails you a prepaid return label, so return shipping costs you nothing.
How it works
- Email us at support@everwood-interiors.com with your order number.
- We send a prepaid label within 1 business day.
- Your refund goes back to your original payment method within 5–7 days of the carrier scan.
Items should be unused and in their original packaging. Damaged or defective on arrival? Send a photo — Everwood Interiors replaces or refunds immediately, and in most cases you won't need to send anything back.
Follow us →






