Skip to product information
Vesgantti Oversized 6-Seater Chenille L Shaped Sectional Sofa, Beige | Modular, with Ottoman, Storage Armrests, Comfy Couch for Living Room, Apartment, Breathable Fabric, Pet-friendly
$1,649.98
Shipping calculated at checkout.
Product Details
- Brand: Vesgantti
- Color: Chenille-beige
- Size: 127" L Shape-6 Seat+Ottoman
- Item Dimensions: 126.76 x 99.21 x 31.5 inches
- Item Weight: 80.2 pounds
- Included Components: Backrest Section
- Unit Count: 1 Count
- Model Number: Velvet Exper
- Manufacturer: Vesgantti
- Shape: L-Shape
- Item Dimensions D x W x H: 126.76"D x 99.21"W x 31.5"H
- Leg Length: 2.36 inches
- Item Depth: 31.5 inches
- Sofa Type: Sectional
- Additional Features: Armrest
- Room Type: Living Room, Meeting Room
- Number of Pieces: 5
- Indoor Outdoor Usage: Indoor
- Orientation: modular
- Item Type Name: Sectional sofa
- Manufacturer Part Number: Velvet Exper
- Style Name: Modern
- Arm Style: Padded
- Back Style: Cushion Back
- Cushion Style: Thick
- Upholstery Color: Beige
- Finish Types: Textured
- Weight Capacity Maximum: 250 pounds
- Seating Capacity: 7
- Seat Cushion Configuration: Multiple Cushion Seat
- Upholstery Fabric Type: Chenille
- Frame Material Type: Wood
- Material Type: Wood
- Seat Fill Material: Foam
- Seat Back Fill Material: Foam
- Fill Material: High Density Foam
- Material Features: soft and durable chenille imitation linen fabric with high-density weaving for strong wear and scratch resistance
- Cushion Construction: High-density foam with supportive spring system
- Component Connector Assembly: Installation Required
About this item
- Spacious Modular Design: Dimensions: L 126.76" W 99.21" H 31.50". This 7 seater sectional sofa offers generous seating for family gatherings, movie nights, and guests. This versatile sectional couch blends style and function as one of the sectional couches for living room. This modular sectional sofa supports flexible layouts, including l shaped couch, U shaped couch, or custom configurations
- Smart Storage & Convenience: Built for modern living, this corner sofa includes USB charging ports, dual cup holders, a hidden storage console, and spacious armrest compartments. Whether storing remotes, books, tablets, blankets, or daily essentials, this modular sofa with storage keep everything organized and within easy reach. The thoughtful storage design helps reduce clutter while adding convenience to your everyday relaxation and entertainment experience
- Premium Chenille Comfort: Upholstered in soft and durable chenille imitation linen fabric, this sofa comfy couch offers lasting comfort and performance. Built with high-density weaving, this beige couch provides strong wear and scratch resistance, helping prevent pilling, scuffs, and long-term sagging from daily use. Thick cushions, supportive seating, and widened armrests create a cozy space for reading, watching TV, or relaxing with family
- Durable Construction: Crafted with a sturdy solid wood frame, high-density foam, and supportive spring system, this sectional sofa with ottoman is built for lasting stability and comfort. The integrated sofa cup holder design adds functionality, while CertiPUR-US certified cushions are non-toxic, odor-free, and pet-friendly. Designed as versatile sofas para sala, this beige sofa complements a wide range of interior styles and family living spaces
- Multiple Package Delivery & Easy Assembly: This modern oversized sofa offers spacious seating and features a secure buckle connection system for easy setup. Designed for convenience and durability, this furniture sofas living room piece is simple to assemble and maintain. To better protect each component during transit, this sectional sofa is shipped in 5 separate packages, which may arrive at different times
CARE & MAINTENANCE
To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.
SHIPPING & RETURNS
We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.